GIEC OpenIR
(本次检索基于用户作品认领结果)

浏览/检索结果: 共2条,第1-2条 帮助

限定条件            
已选(0)清除 条数/页:   排序方式:
Thermoeconomic evaluation and optimization of LiBr-H2O double absorption heat transformer driven by flat plate collector 期刊论文
ENERGY CONVERSION AND MANAGEMENT, 2018, 卷号: 162, 页码: 66-76
作者:  Wang, Lingbao;  Bu, Xianbiao;  Wang, Hanzhi;  Ma, Zhitong;  Ma, Weibin;  Li, Huashan
收藏  |  浏览/下载:181/0  |  提交时间:2020/10/29
Solar double absorption heat transformer  Flat plate collector  Annualized capital cost  Payback period  Absorber/evaporator temperature  
THE CASE STUDY OF BINARY POWER PLANT BASED ON THERMOECONOMICS IN SICHUAN, CHINA 期刊论文
THERMAL SCIENCE, 2018, 卷号: 22, 期号: 2, 页码: 1003-1014
作者:  Luo, Chao;  Wang, Yongzhen;  Gong, Yulie;  Ma, Weibin;  Zhao, Jun;  An, Qingsong
收藏  |  浏览/下载:243/0  |  提交时间:2020/10/29
geothermal power plant  binary cycle  thermoeconomics  capital cost  engineering equation solver