Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant | |
Wu, Chuangzhi1,2; Yin, Xiuli1; Ma, Longlong1; Zhou, Zhaoqiu1; Chen, Hanping2 | |
2008-11-01 | |
发表期刊 | ENERGY & FUELS |
ISSN | 0887-0624 |
卷号 | 22期号:6页码:4259-4264 |
通讯作者 | xlyin@ms.giec.ac.cn |
摘要 | The design and operation of a 5.5 MWe biomass integrated gasification combined cycle (IGCC) demonstration plant, which is located in Xinghua, Jiangsu Province of China, are introduced. It is the largest complete biomass gasification power plant that uses rice husk and other agricultural wastes as fuel in Asia. It mainly consists of a 20 MWt atmospheric circulating fluidized-bed gasifier, a gas-purifying system, 10 sets of 450 kW(e) gas engines, a waste heat boiler, a 1.5 MWe steam turbine, a wastewater treatment system, etc. The demonstration plant has been operating since the end of 2005, and its overall efficiency reaches 26-28%. Its capital cost is less than 1200 USD/kW, and its running cost is about 0.079 USD/kWh based on the biomass price of 35.7 USD/ton. There is a 20% increment on capital cost and 35% decrease on the fuel consumption compared to that of a 1 MW system without a combined cycle. Because only part of the project has been performed, many of the tests still remain and, accordingly, must be reported at a later opportunity. |
文章类型 | Article |
其他摘要 | The design and operation of a 5.5 MWe biomass integrated gasification combined cycle (IGCC) demonstration plant, which is located in Xinghua, Jiangsu Province of China, are introduced. It is the largest complete biomass gasification power plant that uses rice husk and other agricultural wastes as fuel in Asia. It mainly consists of a 20 MWt atmospheric circulating fluidized-bed gasifier, a gas-purifying system, 10 sets of 450 kW(e) gas engines, a waste heat boiler, a 1.5 MWe steam turbine, a wastewater treatment system, etc. The demonstration plant has been operating since the end of 2005, and its overall efficiency reaches 26-28%. Its capital cost is less than 1200 USD/kW, and its running cost is about 0.079 USD/kWh based on the biomass price of 35.7 USD/ton. There is a 20% increment on capital cost and 35% decrease on the fuel consumption compared to that of a 1 MW system without a combined cycle. Because only part of the project has been performed, many of the tests still remain and, accordingly, must be reported at a later opportunity. |
关键词 | Power-generation System Energy Farm Project Combustion Characteristics Fixed-bed China Technologies |
WOS标题词 | Science & Technology ; Technology |
DOI | 10.1021/ef8004042 |
研究领域[WOS] | Energy & Fuels ; Engineering |
URL | 查看原文 |
关键词[WOS] | POWER-GENERATION SYSTEM ; ENERGY FARM PROJECT ; COMBUSTION CHARACTERISTICS ; FIXED-BED ; CHINA ; TECHNOLOGIES |
收录类别 | SCI |
语种 | 英语 |
项目资助者 | National Tenth Five-Year Plan of China [2003AA514010]; Knowledge Innovation Program of CAS [KGCX2-306]; Ministry of Science and Technology of the People's Republic of China ; Chinese Academy of Sciences |
WOS类目 | Energy & Fuels ; Engineering, Chemical |
WOS记录号 | WOS:000261057100096 |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | http://ir.giec.ac.cn/handle/344007/3410 |
专题 | 中国科学院广州能源研究所 |
作者单位 | 1.Chinese Acad Sci, Guangzhou Inst Energy Convers, Renewable Energy & Gas Hydrate Key Lab, Guangzhou 510640, Peoples R China 2.Huazhong Univ Sci & Technol, State Key Lab Coal Combust, Wuhan 430074, Peoples R China |
推荐引用方式 GB/T 7714 | Wu, Chuangzhi,Yin, Xiuli,Ma, Longlong,et al. Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant[J]. ENERGY & FUELS,2008,22(6):4259-4264. |
APA | Wu, Chuangzhi,Yin, Xiuli,Ma, Longlong,Zhou, Zhaoqiu,&Chen, Hanping.(2008).Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant.ENERGY & FUELS,22(6),4259-4264. |
MLA | Wu, Chuangzhi,et al."Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant".ENERGY & FUELS 22.6(2008):4259-4264. |
条目包含的文件 | 下载所有文件 | |||||
文件名称/大小 | 文献类型 | 版本类型 | 开放类型 | 使用许可 | ||
Design and Operation(373KB) | 开放获取 | -- | 浏览 下载 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论